Visit Open-E website

Search:

Type: Posts; User: Kenjifujima

Search: Search took 0.00 seconds.

  1. Replies
    7
    Views
    13,281

    We changed the frame size jumbo frames (9000). We...

    We changed the frame size jumbo frames (9000). We set all the switches and network cards in Windows jumbo frames, because we have the same Windows-based servers connected to the SAN Dell EqualLogic....
  2. Replies
    5
    Views
    13,960

    No, the console output. The machine was turned...

    No, the console output. The machine was turned off to the UPS came through the web tool.
    After pressing the power button on the machine booted successfully. I like to have the system reboot on its...
Results 1 to 2 of 3