Visit Open-E website
Results 1 to 3 of 3

Thread: Check Consistency

  1. #1

    Default Check Consistency

    DSS lite check consistency once a week periodically at the same time and reports process as error to email(it include among 120 emails with task progress description). I didnīt schedule task checking consitency and I cannot find it anywhere in cron. Was consitency check started because system detected problem on an array? How can I set up this task?

  2. #2

    Default

    Can you post one of the emails

  3. #3

    Default

    Date: Sun, 6 Apr 2008 00:21:35 +0200
    To: a@a.a
    Subject: Error(s) on dss1 from Adapter 1 Logical Drive 1: Check Consistency is in PROGRESS 2%
    From: a@a.a
    Adapter 1 Logical Drive 1: Check Consistency is in PROGRESS 2%:

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •