Hello,

I'd like to know how i can setup my MGE Pulsar M 2200 RT ups because i was planning to put the Open-e NAS server as a slave of another server hosting the UPS administration tool. I've got several servers to shutdown in case of power failure.

Please have a look at this diagram :

Where i would like the Open-e server to be a slave.

I guess that Open-e can run the "upsmon" daemon in slave mode, so could you just tell me which settings i must choose in the UPS hardware configuration page to make it listening for shutdown orders from the master server :
  • UPS model
  • Port
  • Timeout


Thanks a lot !
---
Mathieu