If I have an existing 1G replication link with a DSS with auto failover, what steps would I have to do to replace the 1G card with the 10G card.

There is a 5tb volume that has already been replicating using the 1G, would like to avoid have to redo the replication from scratch if it can be avoided.

Would I:
stop failover
shutdown both servers to add the 10G cards
Bring up both servers and set up replication link ips using the 10g cards
start replication tasks and wait for replication to complete
start autofailover

Biggest question I have is can I shut down the 1g replication and setup the 10g without having to replicate the primary to secondary from scratch.